AdvertiseDonate
Thursday, November 26, 2026
Big-city news, all in one place.
Hot News Report · 835 Hanover Street, Suite 201, Manchester, NH 03104
News · Stony Brook

Stony Brook Journalism Students Gain Access to Dual Live Broadcast Capabilities

A six-month renovation of the School of Communication and Journalism’s facilities, funded by the university’s Fast Impact Fund, allows for simultaneous shows and live campus feeds by spring.

By Elena Greco ·

Illustration for: Stony Brook Journalism Students Gain Access to Dual Live Broadcast Capabilities
Illustration generated for this article, not a news photograph.

Stony Brook University’s School of Communication and Journalism (SoCJ) can now produce two simultaneous broadcasts starting in the spring semester. The capability comes from a six-month renovation of the department’s broadcast facilities, which concluded with a ribbon-cutting ceremony on November 12.

The new infrastructure replaces static backdrops with live camera feeds. Students can now display moving images behind them while on air. They may also choose to broadcast with a live street view of the campus in the background. This setup allows passersby and everyday campus activity to appear directly in the student-produced content.

The renovation created modern production spaces for broadcasting, podcasting, and livestreaming. The project was funded by President Andrea Goldsmith’s Fast Impact Fund. Goldsmith established these funds to support investments that provide immediate impact across the university. She linked the new facilities to the university’s Aspire 2035 strategic plan and emphasized the role of media literacy in an era of artificial intelligence.

The renovated spaces include Studio B at the Educational Communication Center and the Glass Studio in Melville Library. The Glass Studio features a floor-to-ceiling glass wall that looks out onto the campus. This design allows students to film with an open view of the university grounds behind them.

Brian Jingeleski, an instructional support technician in the department of journalism, explained the technical upgrades during the event. "By spring we’ll be able to do a broadcast separate from the control room," Jingeleski said. "We’re going to have our own switcher and rundown so we can do two shows simultaneously." He noted that the department plans to support separate broadcasts that air at the same time.

The new setup expands the range of programming students can produce. Sarah Lejuez, an assistant professor of practice, identified a potential nutrition program as a priority for the coming term. She stated that she is excited to see the idea take shape in the new environment.

Jingeleski described the Glass Studio as a flexible collaborative environment. The space includes a podcast area and a production setup designed for adaptability. "All the desks are on wheels, so we can arrange for whatever teaching we want to do," he said. He added that the room can be configured for roundtable discussions or other instructional formats.

Interim dean Stephanie Kelton sought the funding for the project while leading the school. Vice President and Provost Carl Lejuez recognized Kelton’s efforts during the ceremony. He stated that the renovation aligned with the vision of SoCJ Dean Karen Wilkins. "When Karen came in as dean, it was so clear how it fit her vision," Lejuez said.

Paul Christensen, a technical support assistant, and Jingeleski received thanks for their hands-on work in bringing the studios to life. The project involved significant logistical coordination to complete the work within the six-month timeline.

Recent SoCJ graduate Miles Reese appeared in a video shown at the event. Reese graduated in May 2026 and currently works as a reporter and multimedia journalist at WSLS, an NBC affiliate in Roanoke, Virginia. "This is only going to build on the great experience that you’re going to have at the journalism school at Stony Brook," Reese said. The video included a before-and-after time-lapse of the renovation and footage of students using the completed spaces for classroom instruction.

The school celebrated the opening with a ceremony in Studio B, followed by a tour of the Glass Studio. The new facilities are now ready for student use.

More News · Report a business · Got a Story?

Get Hot News Report in your inboxBig-city news, all in one place. Free, a few times a week, unsubscribe any time.

Related stories

Get Hot News Report in your inboxBig-city news, all in one place. Free, a few times a week, unsubscribe any time.